Foundation Guide

Bring the approved house drawing and site information together before the local team designs or builds the supports.

Review the site

Ask your local team to assess the ground conditions, slope, drainage and access. Record the proposed position, surrounding finished levels and the route for delivery and lifting equipment.

Collect model-specific information

  • Request the approved folded and expanded drawings, support locations and applicable loads for the selected configuration.
  • Identify the entry level, service penetrations and any optional roof, deck or external stairs.
  • Give the site and model information to the local structural professional before choosing the foundation arrangement.

Plan drainage and service routes

Coordinate finished floor level, drainage, water and electrical service routes with the foundation and house layout. Review the clearances needed to connect and maintain the systems.

Check readiness before delivery

Have the local installation team verify the completed supports and access against the approved drawings. Confirm on-site responsibilities, share photos if requested and resolve discrepancies before the delivery date.

LINGLIN WeChat QR code

Scan to contact LINGLIN on WeChat

LINGLIN WhatsApp Business QR code

Open WhatsApp chat

Tell Us About Your Project