Expandable House Handover Checklist

Record the finish checks, trade tests and documents needed when a project is handed over.

Start with the approved documents

Collect the final drawing, quotation, included-item list and model-specific installation instructions. Confirm which finishes and connections were in the supplier scope and which were completed locally.

Walk through the house with the installer

Operate the doors and windows, review visible perimeter seals and junctions, and inspect floors, transitions and installed fittings. Photograph outstanding items and record their location so they can be found again.

Record completed service checks

Ask the qualified trades for the agreed electrical, water and drainage checks and any records required for the project. Confirm the equipment access, shutoff locations and maintenance instructions with the person receiving the house.

Agree who will close each item

Make a short list of pending items, a responsible person and an agreed date. Keep photographs, care instructions, parts information and local sign-offs together with the drawings.