
Start With the Specification
Confirm the model, quantity and optional components before arranging shipment. Changes to the supplied scope can affect packing and loading.
Prepare the Shipping Information
Request packed dimensions, gross weight, packing lists and lifting information. Discuss customs and transport requirements with the relevant local specialists.
Arrange the Receiving Site
Check unloading access, lifting equipment and foundation readiness. Agree responsibilities for each stage of delivery and installation.
