Production Line

Follow the LINGLIN workshop stages from the steel frame through interior finishes, joint review and packing.

An expandable house module being handled in the LINGLIN workshop

Explore production by stage

Expandable house steel frame in the LINGLIN workshop

Frame Welding & Preparation

See the steel frame and review the model-specific information that belongs in a frame check.

Explore frame preparation

Finished floor and expansion lines inside a LINGLIN display unit

Floor Installation & Finishes

Review finished floor examples, transitions and details to confirm with your installer.

Review floor installation

Door and exterior cladding on a LINGLIN display unit

Sealing & Joint Details

Identify the openings, panel junctions and installation interfaces that need review.

Review sealing details

A folded unit suspended inside the workshop

Packing & Shipping

Watch a folded unit being loaded and confirm the information your carrier and site team need.

Explore packing and shipping

Coordinate before dispatch

Ask which checks and supporting records apply to your configuration. Confirm the approved drawing, model options, package list and who will handle delivery and on-site work.

LINGLIN WeChat QR code

Scan to contact LINGLIN on WeChat

LINGLIN WhatsApp Business QR code

Open WhatsApp chat

Tell Us About Your Project