Expandable Container House Installation Guide
Use this planning guide to coordinate delivery, the local installation crew and project handover.
Confirm the model and drawings
Review the approved layout and revision, folded dimensions, lifting information, support or anchoring details, utility entry points and the installation instructions for the exact unit delivered. Make sure the supplier, carrier and crew are using the same set.
Prepare before delivery
- Confirm vehicle access, turning space, overhead clearance and the unloading area.
- Ask the local team to confirm foundation readiness and services against the approved drawings.
- Agree who will receive the unit, arrange lifting and handle connections and finishing.
Receive and place the unit
Inspect the shipment against the packing list and photograph any transport damage before work continues. Have the qualified crew manage lifting, placement and opening using the approved model instructions and the site-specific lifting plan.
Coordinate site connections
Have qualified local trades connect and test the agreed electrical, water and drainage services. Check accessibility around connections and equipment before finishes are completed.
Handover checklist
- Check door and window operation, interior finishes, visible seals and included items.
- Record service tests, outstanding items and the person responsible for each one.
- Keep the approved drawings, model instructions and maintenance information with the property records.